Freedom Front Plus
Search
Freedom Front Plus

Ekurhuleni call centre collapses

The Freedom Front Plus (VF Plus) is extremely concerned about the latest quarterly report confirming that the Ekurhuleni Metro’s call centre – the Metro’s primary service-delivery hotline – has collapsed and is failing residents in their hour of need.

According to the Department of Service Delivery Coordination, the Metro receives more than 100 000 calls per month and fails to meet its own performance standards.

The figures are alarming:

• The number of calls that remain unanswered has risen to 10,22% – more than three times the target of 3%.

• The average waiting time has jumped from 26 seconds last year to 68 seconds this year – a clear sign of a system that is failing.

Even more worrying is the fact that Germiston alone accounts for nearly 20% of all top-five queries.

This points to a concentration of infrastructure failures, such as sewer blockages, widespread electricity outages and ongoing problems with prepaid meters. These are the most prevalent complaints, indicating systemic decline in key municipal services.

The Metro’s interactive voice response (IVR) system is also not being effectively utilised, even though it is a tool meant to relieve pressure on agents.

Agents handled an average of 281 calls per day in the previous quarter, but that number has since plummeted to a shocking 38. This is a serious warning sign of management failures or data-management problems, which warrant an urgent forensic investigation.

The call centre is the first point of contact for residents requiring assistance. When it fails, the Metro fails. An administration cannot claim to prioritise service delivery if residents have to hold the line, keep calling or simply give up because there is no answer. This is not a technical fault – it is a leadership failure.

The Freedom Front Plus requests the following:

• A comprehensive operational audit of the call centre, including optimisation of the IVR system.

• Proper staffing, training and scheduling of agents.

• Transparent reporting on turnaround times for water, electricity and sewerage issues.

• Accountability for management failures contributing to poor performance.

Die VF Plus sal aktief werk vir ’n funksionele metro waar ’n belsentrum nie ’n bottelnek is nie, maar ’n lewensbelangrike diens wat altyd beskikbaar is vir inwoners.

SHARE THIS:

RELATED POSTS

Wil jy voortgaan in Afrikaans of Engels?

Kies hieronder.

Would you like to continue in English or Afrikaans?

Choose below.